Sürdürülebilir Kalkınma Amaçları

  • MakaleYalnız künye2018Scopus SJRQ1
    Thermodynamic and thermoeconomic analyses of an organic Rankine cycle adapted gas turbine cycle using S-CO2 ; [Organik Rankine çevrimi entegre edilmiş S-CO2 kullanılan bir gaz türbin çevriminin termodinamik ve termoekonomik analizi]

    Tozlu, Alperen; Özahi, Emrah; Abuşoğlu, Ayşegül

    In this study, a model of an organic Rankine cycle (ORC) adopted gas turbine cycle using supercritical CO2 (S-CO2) as working fluid is performed. Thermodynamic analyses of a system are carried out using Aspen Plus and EES programs. As a result of thermodynamic analyses, electricity production capacity, energy and exergy efficiencies of the proposed system are evaluated as 1530.88 kW, 23.30% and 59.60%, respectively. For the thermoeconomic analysis of the system, specific exergy costing method, SPECO, is applied as widely used one among the second law based methods. Unit exergetic cost of electricity production for 1 kWh is found to be 7.28 ¢ and the total cost of electricity production for 1530.88 kWh is found to be 114.43 $. Annual return from the system of ORC adopted gas turbine cycle using S-CO2which has the total investment cost of 3,033,300 $ is evaluated as 741,146 $ taking into account the difference between the cost of electricity production and the sale price of electricity. As a result of the thermoeconomic analysis, the payback period of the system is found to be 4.09 years. Purpose: To propose a model (an organic Rankine cycle (ORC) adopted gas turbine cycle using supercritical CO2: S-CO2) for an existing solid waste power plant in the frame of the heat recovery (Waste-to-energy). Theory and Methods: Thermodynamic and thermoeconomic analyses were utilized for the proposed model in order to evaluate the energy and exergy efficiencies. Results: The energy and exergy efficiencies of the system were calculated as 23.30 % and 61.60 % respectively. 1 kWh of electricity generated from GT-ORC system is produced to 7.28 ¢. The total electricity production cost of 1530.88 kW-hours was calculated as $ 111.43. Conclusion: The total cost of the developed GT-ORC system is $ 3,033,300. The difference between the cost of electricity generated from the GT-ORC system and the cost of the electricity sales is expected to be $ 741,146 annually for the proposed GT-ORC system. As a result of this profit, the payback period of the system was calculated as 4.09 years.

    AtıfScopus8
    Scopusİncele
  • MakaleYalnız künye2018Scopus SJRQ1
    Thermoeconomic analysis and optimization of a Re-compression supercritical CO2 cycle using waste heat of Gaziantep Municipal Solid Waste Power Plant

    Tozlu, Alperen; Abuşoğlu, Ayşegül; Özahi, Emrah

    This paper presents thermodynamic and thermoeconomic analyses as well as optimization of a re-compression supercritical CO2 cycle. A gas turbine cycle (GT) is adapted as a model to an existing plant to generate additional power in Gaziantep Municipal Solid Waste Power Plant (GMSWPP). The total capital cost rate and total cost rate of the GT cycle are found to be 20.47 $/h and 77.14 $/h, respectively utilizing SPECO by using the exhaust gas of 16 kg/s with 1.9 bar and 566.7 °c. The net power, the energy and exergy efficiencies, the total cost and the total capital cost rates of the GT cycle are optimized by +1.73%, +3.21%, +2.45%, −1.11% and −1.64%, respectively using NSGA-II in MATLAB in the range of 2.5≤PR≤4, 200≤P6≤216, 16≤T0≤23 and 9.1≤LMTD≤12.9. This paper provides an originality such that optimization as well as thermodynamic and thermoeconomic analyses is performed simultaneously for an existing MSW power plant, which can be stressed that there are scarce amounts of studies related on this field. Moreover, as another novelty, it can be emphasized that net power output of such like plants which have similar capacity can be improved using the developed model and NSGA-II optimization method.

    • SDG 7 · Erişilebilir ve Temiz Enerji
    • SDG 9 · Sanayi, Yenilikçilik ve Altyapı
    • SDG 12 · Sorumlu Üretim ve Tüketim
    • SDG 13 · İklim Eylemi
    AtıfScopus47WoS43OpenAlex48
    ScopusWeb of Scienceİncele
  • Proje2016
    Biyobozunur Katı Atık Tesislerinin Termodinamik, Termoekonomik Analiz Ve Optimizasyonları Çerçevesinde Yenilenebilir Enerji Potansiyellerinin Araştırılması Ve Sıfır Atık Yaklaşımıyla Sürdürülebilir Modellerin Geliştirilmesi

    Abuşoğlu, Ayşegül; Özahi, Emrah; Tozlu, Alperen

    In this study, thermodynamic and thermoeconomic analysis are performed using actual operating data of the Gaziantep Solid Waste Power Plant in Gaziantep. ASPEN Plus Engineering and Engineering Equation Solver (EES) software programs are used in order to analyze the current system thermodynamically. Energetic and exergetic efficiencies of the system are evaluated as 39.57 % and 56.29 %, respectively. Thermoeconomic analyses are performed by using "specific exergy costing" (SPECO) method and the payback period is found to be 5.82 year according to the analyses. In additition, five different scenarios are carried out for the purpose of energy recovery from the exhaust gas of the system and thermodynamic and thermoeconomic analyses of scenarios are also carried out. Scenario 2 (Electricity production using gas turbine cycle) is found to be the optimal scenario which can be integrated into the system in terms of the thermodynamic and thermoeconomic analyses. As a result of the thermodynamic analyses of scenario 2, energetic and exergetic efficiencies are found to be 47.16 % and 61.83 %, respectively. Also, 1287 kW extra power can be produced using second scenario which has a short payback period of 3.7 year. By means of these proposed scenarios and conducted analyses, the first study for solid waste power plant in Turkey is carried out in detail. This detailed study is conducted for the first time that related to solid waste power plants in Turkey with proposed scenarios and performed analyses. In addition to this, the other novelty of this study is to assess the proposed scenarios in the project for other solid waste power plants in Turkey in the frame of zero waste.