Assembly Line Worker Assignment and Balancing Problem by Considering Labor Cost

MakaleAçık Erişim
  • SDG 8 · İnsana Yakışır İş ve Ekonomik Büyüme

Özet

Assignment of worker appears as a new problem in the literature for assembly lines (AL) where the workforce is heterogeneously located. The difference of this line balancing from the traditional line is that the assembly task times of the workers to be assigned to the stations differ from each other. Especially assembly lines issues are generally a labor-intensive type of production. Therefore, for assembly line problems, balancing activity should be done considering the labor costs. Thus, the proposed solutions will be able to produce more realistic results for real life. For this purpose, in this study, a mixed-integer mathematical formulation is presented for assembly line worker assignment and balancing problems by considering the objective function of minimizing labor costs and cycle time. The efficiency of the proposed model and the improvements have been demonstrated by solving test instances in the literature.

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/bayburt/16624Resmi atıflarda kullanılan kalıcı adres
DOI
https://doi.org/10.38088/jise.902395Yayıncı resmi DOI adresi
İndeks kayıtları
Kaydın indeks veri tabanlarındaki sayfası (aktarımda alınan kayıt numarasıyla). Erişim, indeksin kendi koşullarına bağlıdır.
Atıflar
OpenAlex
0
TR Dizin
1
Her kaynağın kendi saydığı toplam atıf; aktarım ve zenginleştirme sırasında alındı.
Tam Kayıt
AlanDeğerDil
dc.contributor.authorYılmaz, Hamid
dc.date.accessioned2026-10-29T19:24:59.210129658Z
dc.date.available2026-10-29T19:24:59.210129658Z
dc.date.issued2022
dc.description.abstractAssignment of worker appears as a new problem in the literature for assembly lines (AL) where the workforce is heterogeneously located. The difference of this line balancing from the traditional line is that the assembly task times of the workers to be assigned to the stations differ from each other. Especially assembly lines issues are generally a labor-intensive type of production. Therefore, for assembly line problems, balancing activity should be done considering the labor costs. Thus, the proposed solutions will be able to produce more realistic results for real life. For this purpose, in this study, a mixed-integer mathematical formulation is presented for assembly line worker assignment and balancing problems by considering the objective function of minimizing labor costs and cycle time. The efficiency of the proposed model and the improvements have been demonstrated by solving test instances in the literature.
dc.identifier.doi10.38088/jise.902395
dc.identifier.eissn2602-4217
dc.identifier.endpage31
dc.identifier.issue1
dc.identifier.startpage22
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/bayburt/16624
dc.identifier.volume6
dc.language.isoen
dc.relation.ispartofJournal of Innovative Science and Engineering (JISE)
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectEndüstri Mühendisliği
dc.subjectİmalat Mühendisliği
dc.titleAssembly Line Worker Assignment and Balancing Problem by Considering Labor Cost
dc.typeArticle
rdl.citation.openalex0
rdl.citation.trdizin1
rdl.oa.statusgold
rdl.oa.urlhttps://doi.org/10.38088/jise.902395
rdl.sdgSDG08
rdl.source.indexTRDIZIN