District heating and electricity production based on biogas produced from municipal WWTPs in Turkey: A comprehensive case study
Özet
In this paper, district heating (DH) potentials of the wastewater treatment plants (WWTPs) based on their biogas, electricity, and heat productions are considered. Two district heating scenarios are developed: (i) DH Scenario I which is based on both excess biogas storage of the WWTP and exhaust gas of the cogeneration with the actual power output, (ii) DH Scenario II which is based on the exhaust gas of the cogeneration with the increased power output using all the biogas produced. In DH Scenario I, it is found that 458 dwellings can be heated via the DH system proposed considering only the waste heat of the cogeneration. In addition, the natural gas consumption of 1112 dwellings with the same annual heating load can also be met using the purified biogas. In DH Scenario II, the electricity production could be increased to 1643 kWh by burning all the biogas produced in the cogeneration plant. In this scenario, the annual heating load of 755 dwellings in Gaziantep province can be covered using the waste heat in the DH system. The payback period for the DH Scenario I is calculated as 2.5 years, while for the DH Scenario II, it is obtained as 2 years.
Anahtar Kelimeler
- Scopus
- 27
- WoS
- 28
Tam Kayıt
| Alan | Değer | Dil |
|---|---|---|
| dc.contributor.author | Abusoglu, Aysegul | |
| dc.contributor.author | Tozlu, Alperen | |
| dc.contributor.author | Anvari-Moghaddam, Amjad | |
| dc.date.accessioned | 2026-10-29T19:10:46.880130168Z | |
| dc.date.available | 2026-10-29T19:10:46.880130168Z | |
| dc.date.issued | 2021 | |
| dc.description.abstract | In this paper, district heating (DH) potentials of the wastewater treatment plants (WWTPs) based on their biogas, electricity, and heat productions are considered. Two district heating scenarios are developed: (i) DH Scenario I which is based on both excess biogas storage of the WWTP and exhaust gas of the cogeneration with the actual power output, (ii) DH Scenario II which is based on the exhaust gas of the cogeneration with the increased power output using all the biogas produced. In DH Scenario I, it is found that 458 dwellings can be heated via the DH system proposed considering only the waste heat of the cogeneration. In addition, the natural gas consumption of 1112 dwellings with the same annual heating load can also be met using the purified biogas. In DH Scenario II, the electricity production could be increased to 1643 kWh by burning all the biogas produced in the cogeneration plant. In this scenario, the annual heating load of 755 dwellings in Gaziantep province can be covered using the waste heat in the DH system. The payback period for the DH Scenario I is calculated as 2.5 years, while for the DH Scenario II, it is obtained as 2 years. | |
| dc.description.sponsorship | Danida Fellowship Centre, DFC | |
| dc.description.sponsorship | Udenrigsministeriet, (18-M06-AAU) | |
| dc.description.sponsorship | Udenrigsministeriet | |
| dc.identifier.articlenumber | 119904 | |
| dc.identifier.doi | 10.1016/j.energy.2021.119904 | |
| dc.identifier.eissn | 1873-6785 | |
| dc.identifier.issn | 0360-5442 | |
| dc.identifier.scopus | 2-s2.0-85100719050 | |
| dc.identifier.uri | https://rdlopen.rawdatalibrary.net/r/bayburt/13313 | |
| dc.identifier.volume | 223 | |
| dc.identifier.wos | WOS:000637964600003 | |
| dc.language.iso | en | |
| dc.publisher | Elsevier Ltd | |
| dc.relation.ispartof | Energy | |
| dc.rights | info:eu-repo/semantics/openAccess | |
| dc.subject | Biogas | |
| dc.subject | District heating | |
| dc.subject | Sewage sludge | |
| dc.subject | Thermoeconomic analysis | |
| dc.subject | Wastewater treatment plant | |
| dc.subject.classification | Thermodynamics | |
| dc.subject.classification | Energy & Fuels | |
| dc.subject.other | Turkey | |
| dc.subject.other | Meleagris gallopavo | |
| dc.subject.other | Air purification | |
| dc.subject.other | Biogas | |
| dc.subject.other | Cogeneration plants | |
| dc.subject.other | District heating | |
| dc.subject.other | Gases | |
| dc.subject.other | Housing | |
| dc.subject.other | Investments | |
| dc.subject.other | Natural gas | |
| dc.subject.other | Natural gasoline plants | |
| dc.subject.other | Sewage treatment plants | |
| dc.subject.other | Waste heat | |
| dc.subject.other | Wastewater treatment | |
| dc.subject.other | DH systems | |
| dc.subject.other | Electricity production | |
| dc.subject.other | Heat production | |
| dc.subject.other | Heating load | |
| dc.subject.other | Natural gas consumption | |
| dc.subject.other | Payback periods | |
| dc.subject.other | Power out put | |
| dc.subject.other | Wastewater treatment plants | |
| dc.subject.other | alternative energy | |
| dc.subject.other | cogeneration | |
| dc.subject.other | electricity generation | |
| dc.subject.other | municipal solid waste | |
| dc.subject.other | residential energy | |
| dc.subject.other | scenario analysis | |
| dc.subject.other | thermal power | |
| dc.subject.other | wastewater treatment plant | |
| dc.subject.other | Electric power generation | |
| dc.title | District heating and electricity production based on biogas produced from municipal WWTPs in Turkey: A comprehensive case study | |
| dc.type | Article | |
| rdl.citation.scopus | 27 | |
| rdl.citation.wos | 28 | |
| rdl.oa.status | closed | |
| rdl.oa.status | green | |
| rdl.oa.url | http://hdl.handle.net/20.500.12403/3190 | |
| rdl.scopus.quartile | Q1 | |
| rdl.source.index | SCOPUS | |
| rdl.source.index | WOS | |
| rdl.wos.index | Science Citation Index Expanded (SCI-EXPANDED) |