A Solution Approach to Assembly Line Balancing Problem With Task Related Constraints and an Application At An Enterprise

MakaleYalnız künye

Özet

Occasionally certain tasks in an assembly line balancing problem are required to be kept together due to some specific reasons. These tasks are attained to the same work stations. Such problems are called as ‘Assembly Line Balancing Problem with Task Related Constraints (ALBTRC)’. Certain situations like awkward product construction, simultaneous operations or specific requirements leading to zoning and positional constraints like utilization of common resources as tools, jigs and fixtures are implemented thanks to these supplementary constraints. Additionally, materials handling and tooling costs, distances, set-up and lead times are also reduced. Literature on ALBTRC seems quite rare compared to Classical Line Balancing papers, although ALBTRC is one of the common real life balancing problems. This study aimed to develop and implement a novel line balancing method for a manufacturing concern where known methods are impractical to employ due to some specific positional constraints. ‘Largest Candidate Method’ known as a simple but effective tool is modified for this purpose first. Then a thorough ‘method and time study’ is conducted to get the necessary data to utilize that method. As a result, more efficient alternatives are generated and presented to decision maker

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/bayburt/15559Resmi atıflarda kullanılan kalıcı adres
İndeks kayıtları
Kaydın indeks veri tabanlarındaki sayfası (aktarımda alınan kayıt numarasıyla). Erişim, indeksin kendi koşullarına bağlıdır.
Atıflar
TR Dizin
3
Her kaynağın kendi saydığı toplam atıf; aktarım ve zenginleştirme sırasında alındı.
Tam Kayıt
AlanDeğerDil
dc.contributor.authorİşlier, A. Attila
dc.contributor.authorAltuntas, Serkan
dc.date.accessioned2026-10-29T19:20:36.498892426Z
dc.date.available2026-10-29T19:20:36.498892426Z
dc.date.issued2010
dc.description.abstractOccasionally certain tasks in an assembly line balancing problem are required to be kept together due to some specific reasons. These tasks are attained to the same work stations. Such problems are called as ‘Assembly Line Balancing Problem with Task Related Constraints (ALBTRC)’. Certain situations like awkward product construction, simultaneous operations or specific requirements leading to zoning and positional constraints like utilization of common resources as tools, jigs and fixtures are implemented thanks to these supplementary constraints. Additionally, materials handling and tooling costs, distances, set-up and lead times are also reduced. Literature on ALBTRC seems quite rare compared to Classical Line Balancing papers, although ALBTRC is one of the common real life balancing problems. This study aimed to develop and implement a novel line balancing method for a manufacturing concern where known methods are impractical to employ due to some specific positional constraints. ‘Largest Candidate Method’ known as a simple but effective tool is modified for this purpose first. Then a thorough ‘method and time study’ is conducted to get the necessary data to utilize that method. As a result, more efficient alternatives are generated and presented to decision maker
dc.identifier.endpage44
dc.identifier.issn1300-7009
dc.identifier.issue1
dc.identifier.startpage29
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/bayburt/15559
dc.identifier.volume16
dc.language.isotr
dc.relation.ispartofMühendislik Bilimleri Dergisi
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.subjectEndüstri Mühendisliği
dc.titleA Solution Approach to Assembly Line Balancing Problem With Task Related Constraints and an Application At An Enterprise
dc.typeArticle
rdl.citation.trdizin3
rdl.source.indexTRDIZIN