Prioritising and selecting the railway routes planned in the Eastern Black Sea Region with the AHP and TOPSIS methods

MakaleAçık Erişim
  • SDG 9 · Sanayi, Yenilikçilik ve Altyapı

Özet

The construction of the railway, which is needed for the development of the Eastern Black Sea Region, is an issue that has been discussed and unresolved for about 110 years. The geomorphological structure of the region and the developments in the highway played a role in the delay of the railway construction. However, the developing technology in the railway, Turkey's being a part of the Iron Silk Road Project, and the agreements made with international connections have brought the railway construction to the region again. In the Environmental Plan (EP) approved and in force by the Ministry of Environment, Urbanization and Climate Change, four railway routes are planned to integrate the Eastern Black Sea region with the national/international railway network. These routes are; Samsun-Sarp, Trabzon-Erzincan, Of -Erzurum and Tirebolu-Bayburt. However, some of these routes are alternatives to each other and are not feasible and rational since the implementation of all planned routes requires great costs. The aim of this study is to develop a method for prioritizing and selecting the railway routes planned in the EP. Within the scope of this purpose, by using Analytical Hierarchy Process (AHP) and TOPSIS techniques, which are multi-criteria decision making methods, the routes were listed according to 4 criteria and 10 sub-criteria determined with the help of literature and expert team. As a result of the study; In both techniques, the order was the same and it was determined that the Samsun-Sarp railway was the most priority railway route. Trabzon-Erzincan came second, Of-Erzurum came third and Tirebolu-Bayburt came fourth.

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/bayburt/14510Resmi atıflarda kullanılan kalıcı adres
DOI
https://doi.org/10.5505/pajes.2022.72437Yayıncı resmi DOI adresi
İndeks kayıtları
Kaydın indeks veri tabanlarındaki sayfası (aktarımda alınan kayıt numarasıyla). Erişim, indeksin kendi koşullarına bağlıdır.
Atıflar
WoS
3
OpenAlex
3
TR Dizin
2
Her kaynağın kendi saydığı toplam atıf; aktarım ve zenginleştirme sırasında alındı.
Tam Kayıt
AlanDeğerDil
dc.contributor.authorBoz, Ediz
dc.contributor.authorTürk, Ersin
dc.contributor.authorTogan, Vedat
dc.date.accessioned2026-10-29T19:15:57.688519785Z
dc.date.available2026-10-29T19:15:57.688519785Z
dc.date.issued2023
dc.description.abstractThe construction of the railway, which is needed for the development of the Eastern Black Sea Region, is an issue that has been discussed and unresolved for about 110 years. The geomorphological structure of the region and the developments in the highway played a role in the delay of the railway construction. However, the developing technology in the railway, Turkey's being a part of the Iron Silk Road Project, and the agreements made with international connections have brought the railway construction to the region again. In the Environmental Plan (EP) approved and in force by the Ministry of Environment, Urbanization and Climate Change, four railway routes are planned to integrate the Eastern Black Sea region with the national/international railway network. These routes are; Samsun-Sarp, Trabzon-Erzincan, Of -Erzurum and Tirebolu-Bayburt. However, some of these routes are alternatives to each other and are not feasible and rational since the implementation of all planned routes requires great costs. The aim of this study is to develop a method for prioritizing and selecting the railway routes planned in the EP. Within the scope of this purpose, by using Analytical Hierarchy Process (AHP) and TOPSIS techniques, which are multi-criteria decision making methods, the routes were listed according to 4 criteria and 10 sub-criteria determined with the help of literature and expert team. As a result of the study; In both techniques, the order was the same and it was determined that the Samsun-Sarp railway was the most priority railway route. Trabzon-Erzincan came second, Of-Erzurum came third and Tirebolu-Bayburt came fourth.
dc.identifier.doi10.5505/pajes.2022.72437
dc.identifier.eissn2147-5881
dc.identifier.endpage627
dc.identifier.issn1300-7009
dc.identifier.issue6
dc.identifier.startpage617
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/bayburt/14510
dc.identifier.volume29
dc.identifier.wosWOS:001106632300005
dc.language.isoen
dc.publisherPAMUKKALE UNIV
dc.relation.ispartofPAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectMulticriteria decision making
dc.subjectAnalytic hierarchy process
dc.subjectTOPSIS
dc.subjectRoute planning
dc.subjectRailway
dc.subject.classificationEngineering, Multidisciplinary
dc.subject.classificationEngineering
dc.subject.otherMULTICRITERIA EVALUATION
dc.titlePrioritising and selecting the railway routes planned in the Eastern Black Sea Region with the AHP and TOPSIS methods
dc.typeArticle
rdl.citation.openalex3
rdl.citation.trdizin2
rdl.citation.wos3
rdl.oa.statusgold
rdl.oa.urlhttps://jag.journalagent.com/z4/download_fulltext.asp?pdir=pajes&plng=eng&un=PAJES-72437
rdl.sdgSDG09
rdl.source.indexWOS
rdl.source.indexTRDIZIN
rdl.wos.indexEmerging Sources Citation Index (ESCI)